Redesigned port apron
Ostuferhafen.

 

OSTUFERHAFEN KIEL – PARTIAL DEMOLITION OF FORMER “GAG” GRAIN SILO AND DEVELOPMENT OF AN EXTENDED PORT APRON WITH PRE-STACKING AREAS FOR RORO-FERRY-CARGO

 
The PORT OF KIEL has redesigned the port apron in Ostuferhafen, which is the freight and logistics centre on the fjord. Where once stood a grain silo, there is now an expanded pre-stacking and stand-by area of three hectares for trucks, trailers and passenger cars.

The State Premier of Schleswig-Holstein, Daniel Günther, visited the Ostuferhafen on 12th August to hand over the grant notice coming from the State Programme Economy for 5.44 million Euros: “Located on the interface between continental Europe and the Baltic Sea Region the ports of Schleswig-Holstein are an integral part of European transport chains. With its modern and efficient port infrastructure the port of Kiel contributes to strengthening Germany’s competitive ability and increasing the growth potential of our economic area”, said Minister-President Günther. The construction works for the new port apron took two years and required and investment of about 7.78 million Euros.

On behalf of the State Capital City of Kiel, Lord Mayor Dr Ulf Kämpfer accepted the grant notice: “This redesigned entrance area makes the Ostuferhafen even more efficient. By shifting traffic to the sea routes we contribute to achieving overarching climate goals. In addition, the PORT OF KIEL closely cooperates with the rail company of DB Netz in order to enable hinterland transports to be transhipped in-creasingly by rail. On a local level, the new on-shore power supply plants and the further elec-trification of port operations are important components of our climate protection strategy.”

Aerial view of the old Ostuferhafen
Picture: Tom Körber

2017. Aerial view Sheds 31-36, former grain silo

Construction site at Ostuferhafen
Picture: PORT OF KIEL

2019. Demolition Sheds 34-36, port apron development

Aerial view of the new Ostuferhafen
Picture: PORT OF KIEL

2020. Redesigned port apron

Funding information
Funding note

 

The project to redesign the port apron included dismantling three hall areas of the former grain silo, excavation and road works as well as drainage, lighting and security measures and the connection of the area to the infrastructure. Through the new and generous port apron it has been possible to merge formerly separated pre-stacking areas, shorten distances and gain more space for trucks, busses, trailers and passenger cars. Furthermore, IT solutions have been developed to accelerate the handling processes at the gate, which also allow truck drivers to reduce personal contact.

Dr Dirk Claus, Managing Director at the PORT OF KIEL: “Even under the current circumstances the Ostuferhafen operates in a reliable and safe way. The port of Kiel has proven its systemic importance regarding the transhipment of cross-border freight transport.” In the first seven months of the year 2.1 million tons of cargo have been transhipped via the Ostuferhafen (+ 1 %). Additional volumes have been transported by the ferries of the DFDS shipping company to the Baltic States or they have been delivered by the SCA-RoRo-freighters from Scandinavia. Not only general cargo and forest products are unloaded resp. transhipped in Ostuferhafen but also project and heavy cargo, scrap metal and agricul-tural products. The integrated passenger terminal to handle cruise vessels emphasizes the universal character of this port part.


 

Interview partners during press conference:
- Daniel Günther, MP federal German state of Schleswig-Holstein
- Dr Ulf Kämpfer, Lord Mayor City of Kiel
- Dr Dirk Claus, MD PORT OF KIEL